Fluid saturation

Water and hydrocarbon quantified fluid saturations based on retort analysis (closed and/or open designs).

Can be performed on intact or crushed rock volume. Ideally a minimum of 50-60 grams per sample. If seeking to execute entire workflow design ~120 grams of starting intact material is required. Exception is SS permeameter. Only intact analysis applies.